Project Description

Camp Pendleton initiated a hospital replacement project that was completed at the end of 2013.  External Link.

The entry drive view is visible from the 5 freeway between Los Angeles and San Diego.

The project was built using AutoCAD’s Architectural Desktop and a version of the model was also created in SketchUp.  The SketchUp model started with massing and became the live preview model used during design.  A mixture of the SketchUp model and the AutoCAD files were used for rendering purposes.

NAVFAC - SketchUp Model
NAVFAC SketchUp Model front view.